DGAP-News: ABO Wind AG
/ Key word(s): Market Report
ABO Wind secures further tariffs in innovation tender - Tariffs for two solar/storage combinations - Construction work for first hybrid project about to start - Further battery storage systems in development in several countries ABO Wind was successful for the third time in the third innovation tender of the German Federal Network Agency: Two further hybrid projects combining photovoltaics and battery storage were awarded a tariff. Together, the two projects in Weichenried (Bavaria) and Weilerswist (North Rhine-Westphalia) have a capacity of 9.7 megawatts peak and are scheduled to be connected to the grid by summer 2023 at the latest. ABO Wind has won tariffs for four hybrid projects with a capacity of more than 18 megawatts in the first two innovation tenders in September 2020 and April 2021. The project in Wahlheim, Rhineland-Palatinate, is the most advanced. Here, construction work is expected to begin as early as October. "Storage systems play a crucial role in further increasing the share of electricity generated from renewable energy sources in Germany," says Dr Thomas Treiling, Head of Project Development in Germany. "And we are proud to be one of the pioneers in this innovative sector." In the German innovation tenders, market premiums are awarded for combinations of solar or wind farms and storage. The different plants must be connected to the same grid connection point. In contrast to the other tenders, a fixed market premium is paid. This means that a fixed state renumeration flows in addition to the income from electricity marketing. Electricity storage is a growing business area for ABO Wind and is coordinated in the department Hybrid Energy and Battery Storage Systems, managed by Dr Julia Badeda. In addition to the solar-storage combinations that were successful in the tender, ABO Wind is planning further hybrid projects, primarily in Greece and Spain. In Kells, Northern Ireland, the company is also building a battery storage facility with a capacity of 50 megawatts to stabilise the grid. It will be one of the world's fastest storage systems to react to fluctuations in generation and consumption in the island system. Contact: Alexander Koffka Phone: +49 (0)611 267 65-515 Fax: +49 611 267 65-599 E-Mail: alexander.koffka@abo-wind.de
26.08.2021 Dissemination of a Corporate News, transmitted by DGAP - a service of EQS Group AG. |
Language: | English |
Company: | ABO Wind AG |
Unter den Eichen 7 | |
65195 Wiesbaden | |
Germany | |
Phone: | +49 (0)611 26 765 0 |
Fax: | +49 (0)611 26 765 5199 |
E-mail: | global@abo-wind.de |
Internet: | www.abo-wind.de |
ISIN: | DE0005760029 |
WKN: | 576002 |
Listed: | Regulated Unofficial Market in Berlin, Dusseldorf, Frankfurt, Hamburg, Munich (m:access), Stuttgart, Tradegate Exchange |
EQS News ID: | 1229221 |
End of News | DGAP News Service |
|
1229221 26.08.2021
The information presented here has been provided by our content partner EQS-Group. The originator of the news is the respective issuer, the company relating to the news, a publication service provider (press or information agency) which uses the distribution service of EQS to transmit company news to shareholders, investors, investors or interested parties. The original publications and other company-relevant information can be found at eqs-news.com.
The information you can access does not constitute investment advice. The presentation of our cooperation partners, where the implementation of investment decisions would be possible depending on the individual risk profile, is solely at the discretion of the person using the service. We only present companies of which we are convinced that the range of services and customer service will satisfy discerning investors.
If you are considering leverage products, familiarise yourself with the typical characteristics of the financial instruments beforehand. Take the time to determine the risk content of the planned investment before making an investment decision. Bear in mind that a total loss cannot be ruled out with leverage products.
For newcomers to the subject, we offer various options in both the training and the tools section, through which you can train theoretical knowledge and practical experience and thus improve your skills. The offer ranges from participation in webinars to personal mentoring. The range is continuously being expanded.
1 Lab features are usually functionalities that emerge from the think tank of the investor community. In the early stages, these are experimental functionalities whose development process is largely determined by use and the resulting feedback from the community. When integrating external services or functionalities, the functionality can only be guaranteed to the extent that the individual process elements, such as interfaces, interact with each other.