Put companies on watchlist
Vulcan Energy Resources Limited
ISIN: AU0000066086
WKN: A2PV3A
About
Company Snapshot
New: Enable Investor Alerts
Be informed about new publications
New: AI Factsheet

Corporate News meets AI! 
Content analysis and summary

EN GIF 300X250

Vulcan Energy Resources Limited · ISIN: AU0000066086 · EQS - Company News (58 News)
Country: Australia · Primary market: Australia · EQS NID: 2025449
08 November 2024 08:12AM

Vulcan commences lithium hydroxide production towards product qualification


EQS-News: Vulcan Energy Resources Limited / Key word(s): Product Launch/ESG
Vulcan commences lithium hydroxide production towards product qualification

08.11.2024 / 08:12 CET/CEST
The issuer is solely responsible for the content of this announcement.


Vulcan commences lithium hydroxide production towards product qualification

Significant milestone for Europe’s critical raw materials independence and green mobility transition

 

Vulcan Energy Resources Limited (Vulcan, ASX: VUL, FSE: VUL, the Company) is pleased to announce the start of lithium hydroxide production at the Company’s downstream Central Lithium Electrolysis Optimisation Plant (CLEOP) in Industrial Park Höchst, Frankfurt, Germany.

 

Key highlights

• The first lithium hydroxide has been produced by Vulcan in Germany from the processing of high purity lithium chloride concentrate extracted from brines at its Adsorption-type Direct Lithium Extraction (A-DLE) optimisation plant

• This represents the first sustainable lithium hydroxide fully domestically produced in Europe, including upstream raw material, in one integrated supply chain

• The downstream optimisation plant will supply lithium hydroxide for the battery-grade qualification process with Vulcan’s automotive and battery offtake partners including Stellantis, Renault, LG and Umicore, while the Company’s Phase One commercial plant is being constructed

• Phase One of the project, designated Lionheart, will supply approximately 24,000 tonnes per annum of lithium hydroxide, enough for approximately 500,000 electric vehicles (EVs) per annum

• The Phase One combination of upstream A-DLE production from deep, naturally heated brine reservoirs, combined with downstream conversion to lithium hydroxide using electricity only, represents one of the lowest cost lithium chemical supply chains in the world. [1]

• In addition, the Phase One location in Central Europe is in close proximity to end-user automotive and battery customers, further enhancing the cost competitiveness and low carbon footprint of Vulcan’s operations

• The Company’s Phase One upstream and downstream plants will exclude fossil fuels in both the extraction and processing of lithium, meaning the process has the lowest carbon footprint of any lithium production globally. The operations have been assigned Dark Green by S&P Global Ratings, the highest ever received by a Metals and Mining company globally. S&P Global Ratings’ methodology includes six shades, with a Dark Green rating awarded to activities that correspond to the long-term vision of the low-carbon climate resilient future

• The Phase One process also involves the co-production of valuable renewable heat and power. The excess heat and power will be used within local communities, furthering the decarbonisation of industries within proximity

• The Company’s project financing process continues, led by BNP Paribas, with a debt structuring group including the European Investment Bank, Export Credit Agencies from Australia, France, Italy, and Canada, as well as major European banks ING, Unicredit, ABN-AMRO, and Natixis.

 

Managing Director and CEO, Cris Moreno, commented: “First lithium hydroxide production is an important milestone for Vulcan as we demonstrate Europe’s first fully domestically produced lithium from the integration of Vulcan’s upstream production and downstream conversion optimisation plants, and is pivotal for the battery supply chain resilience of both Germany and Europe.

“Importantly, this combination of process allows a very low cost, highly sustainable, premium product, helping to enable European battery and EV production competitiveness.”

“We look forward to keeping our shareholders updated as we move towards completion of financing and start of commercial construction.”

 

For and on behalf of the Board

Daniel Tydde | Company Secretary

 

Change of address

The Company also advises that it has changed its registered address to Unit 1, Level 11, 1 Spring Street, Perth WA 6000.

Its other contact details remain the same.

 

Further information

Annabel Roedhammer | Vice President Communications | aroedhammer@v-er.eu | +49 1511 410 1585

Judith Buchan | Communications Lead – APAC | jbuchan@v-er.eu | +61 411 597 326

Please contact Vulcan’s Legal Counsel Germany, Dr Meinhard Grodde, for matters relating to the Frankfurt Stock Exchange listing on mgrodde@v-er.eu .

 

About Vulcan Energy

Vulcan Energy (ASX: VUL, FSE: VUL) is building the world’s first carbon neutral, integrated lithium and renewable energy business to decarbonise battery production. Vulcan’s Lionheart Project, located in the Upper Rhine Valley Brine Field bordering Germany and France, is the largest lithium and geothermal resource in Europe and a tier-one lithium project globally. Harnessing natural heat to produce lithium from sub-surface brines and to power conversion to battery grade material and using its in-house industry-leading technology VULSORB®, Vulcan is building a local, low-cost source of sustainable lithium for European electric vehicle batteries. For more information, please go to https://v-er.eu/ .

 

Disclaimer

Some of the statements appearing in this announcement may be in the nature of forward-looking statements. You should be aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and uncertainties include factors and risks specific to the industries in which Vulcan operates and proposes to operate as well as general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among other things. Actual events or results may differ materially from the events or results expressed or implied in any forward-looking statement. No forward-looking statement is a guarantee or representation as to future performance or any other future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many of which will be outside Vulcan’s control.

Vulcan does not undertake any obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions or conclusions contained in this announcement. To the maximum extent permitted by law, none of Vulcan, its Directors, employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information contained in this announcement. You are cautioned not to place undue reliance on any forward-looking statement. The forward-looking statements in this announcement reflect views held only as at the date of this announcement.

This announcement is not an offer, invitation or recommendation to subscribe for, or purchase securities by Vulcan. Nor does this announcement constitute investment or financial product advice (nor tax, accounting or legal advice) and is not intended to be used for the basis of making an investment decision. Investors should obtain their own advice before making any investment decision.

Vulcan has carried out a definitive feasibility study (“DFS”) and bridging engineering study (“Bridging Study”) for its Phase One Project, the results of which were announced to the ASX in the announcements Phase 1 DFS Results dated 13 February 2023 (DFS Announcement) and Bridging Study Results on 16 November 2023 (Bridging Study Announcement). This announcement may include certain information relating to the DFS and the Bridging Study. The DFS and Bridging Study are based on the material assumptions and parameters outlined in their respective announcements. While Vulcan considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Bridging Study or DFS will be achieved. This presentation may also include certain information relating to Phase Two of its Project, Vulcan has not yet carried out a definitive feasibility study for Phase Two of its Project.

 

[1] As per the Project Bridging Study Results released on 16 November 2023.



08.11.2024 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


Language: English
Company: Vulcan Energy Resources Limited
Unit 1, Level 11, Spring Street
WA 6000 Perth
Australia
E-mail: dtydde@v-er.eu
Internet: www.v-er.eu
ISIN: AU0000066086
WKN: A2PV3A
Listed: Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Munich, Stuttgart, Tradegate Exchange
EQS News ID: 2025449

 
End of News EQS News Service

2025449  08.11.2024 CET/CEST

fncls.ssp?fn=show_t_gif&application_id=2025449&application_name=news&site_id=boersengefluester~~~ace3d64b-2049-452a-8d18-fbc8044c4b5f
Visual performance / price development - Vulcan Energy Resources Limited
Smart analysis and research tools can be found here.

This publication was provided by our content partner EQS3.

EQS Newswire
via EQS - Newsfeed
EQS Group AG ©2024
(DGAP)
Contact:
Karlstraße 47 D-80333 München
+49 (0) 89 444 430-000

 

SMART * AD
EN GIF 970X250

P R O D U C T   S U G G E S T I O N S

The information presented here has been provided by our content partner EQS-Group. The originator of the news is the respective issuer, the company relating to the news, a publication service provider (press or information agency) which uses the distribution service of EQS to transmit company news to shareholders, investors, investors or interested parties. The original publications and other company-relevant information can be found at eqs-news.com.


The information you can access does not constitute investment advice. The presentation of our cooperation partners, where the implementation of investment decisions would be possible depending on the individual risk profile, is solely at the discretion of the person using the service. We only present companies of which we are convinced that the range of services and customer service will satisfy discerning investors.

If you are considering leverage products, familiarise yourself with the typical characteristics of the financial instruments beforehand. Take the time to determine the risk content of the planned investment before making an investment decision. Bear in mind that a total loss cannot be ruled out with leverage products.

For newcomers to the subject, we offer various options in both the training and the tools section, through which you can train theoretical knowledge and practical experience and thus improve your skills. The offer ranges from participation in webinars to personal mentoring. The range is continuously being expanded.


1 Lab features are usually functionalities that emerge from the think tank of the investor community. In the early stages, these are experimental functionalities whose development process is largely determined by use and the resulting feedback from the community. When integrating external services or functionalities, the functionality can only be guaranteed to the extent that the individual process elements, such as interfaces, interact with each other.