Edisun Power Europe AG / Key word(s): Miscellaneous Ad hoc announcement pursuant to Art. 53 LR Zurich, November 11, 2022, 6 p.m.
New solar plant of 23 MW starts solar power production The Edisun Power Group has connected another 23.4 MW plant in Portugal to the grid. The connection of the plant "Betty" increases the total installed solar production capacity of Edisun Power to 107.1 MW. The additional annual electricity production is estimated at over 41’000 MWh. More than 46’000 solar modules were installed on an area comparable to 23 football fields. This corresponds to the average electricity consumption of over 9’000 four-person households in Switzerland, assuming a consumption of 4’500 KWh per household. The profitability of the new plant is comparable to the Mogadouro plant (49 MW). Even without feed-in tariffs, an EBITDA margin of over 80% is expected.
More information and video are available on the website of Edisun Power at: https://www.edisunpower.com/en/home-en
Contact: Dr. René Cotting, +41 44 266 61 20, info@edisunpower.com
Edisun Power Group A listed European solar energy producer, the Edisun Power Group finances and operates solar power installations in a number of European countries. Edisun Power began its involvement in this sector as far back as 1997. The company has been listed on the Swiss Stock Exchange since September 2008. Edisun Power has amassed extensive experience in the realization and acquisition of both national and international projects. Currently, the company owns a total of 39 solar energy installations in Switzerland, Germany, Spain, France, Italy and Portugal. The company is geared for significant growth with a secured portfolio of projects under development of more than 900 MW.
Disclaimer This document contains forward-looking statements. These statements are based on the current views, expectations, assumptions and information of the management of the Company. Forward-looking statements should not be construed as a promise of future results and developments and involve known and unknown risks and uncertainties. Actual results, performance or events may differ materially from those described in such statements due to a number of factors. The Company does not assume any obligations to update any forward-looking statements. This document is not an offer to sell or a solicitation of offers to purchase or subscribe for shares.
End of Inside Information |
Language: | English |
Company: | Edisun Power Europe AG |
Universitätstrasse 51 | |
8006 Zürich | |
Switzerland | |
Phone: | +41 44 266 61 20 |
Fax: | +41 44 266 61 22 |
E-mail: | info@edisunpower.com |
Internet: | www.edisunpower.com |
ISIN: | CH0024736404 |
Valor: | 2473640 |
Listed: | SIX Swiss Exchange |
EQS News ID: | 1485475 |
End of Announcement | EQS News Service |
|
1485475 11-Nov-2022 CET/CEST
The information presented here has been provided by our content partner EQS-Group. The originator of the news is the respective issuer, the company relating to the news, a publication service provider (press or information agency) which uses the distribution service of EQS to transmit company news to shareholders, investors, investors or interested parties. The original publications and other company-relevant information can be found at eqs-news.com.
The information you can access does not constitute investment advice. The presentation of our cooperation partners, where the implementation of investment decisions would be possible depending on the individual risk profile, is solely at the discretion of the person using the service. We only present companies of which we are convinced that the range of services and customer service will satisfy discerning investors.
If you are considering leverage products, familiarise yourself with the typical characteristics of the financial instruments beforehand. Take the time to determine the risk content of the planned investment before making an investment decision. Bear in mind that a total loss cannot be ruled out with leverage products.
For newcomers to the subject, we offer various options in both the training and the tools section, through which you can train theoretical knowledge and practical experience and thus improve your skills. The offer ranges from participation in webinars to personal mentoring. The range is continuously being expanded.
1 Lab features are usually functionalities that emerge from the think tank of the investor community. In the early stages, these are experimental functionalities whose development process is largely determined by use and the resulting feedback from the community. When integrating external services or functionalities, the functionality can only be guaranteed to the extent that the individual process elements, such as interfaces, interact with each other.