Put companies on watchlist
ADS-TEC Energy GmbH
ISIN: IE000DU292E6
WKN: A3DA9W
About
Company Snapshot
New: Enable Investor Alerts
Be informed about new publications
New: AI Factsheet

Corporate News meets AI! 
Content analysis and summary

EN GIF 300X250

ADS-TEC Energy GmbH · ISIN: IE000DU292E6 · EQS - Company News (26 News)
Country: Germany · Primary market: Ireland · EQS NID: 1886455
23 April 2024 02:00PM

Ultra-fast charging without expanding the grid – is that possible? Yes, as ADS-TEC Energy is proving at Hannover Messe



EQS-Media / 23.04.2024 / 14:00 CET/CEST

Ultra-fast charging without expanding the grid – is that possible? Yes, as ADS-TEC Energy is proving at Hannover Messe
  • Want to charge an electric vehicle in a few minutes and on a limited grid? No problem with ADS-TEC Energy’s battery-buffered, ultra-fast charging solutions.
  • Winfried Kretschmann, Minister President of Baden-Württemberg, opened "The Länd" pavilion and talked to ADS-TEC Energy CEO Thomas Speidel.
  • ADS-TEC Energy is showcasing its ChargeBox and ChargePost solutions, each with two charging points, at Hannover Messe.
  • The 300 kW ChargePost features two 75-inch advertising displays and the ability to feed from the battery into the vehicle and back into the grid.
 
fncls.ssp?fn=download2_file&code_str=aa80a9585b1ed948100506f6e3cdde4d
 
Hannover, April 23, 2024: At the opening of the Baden-Württemberg pavilion "The Länd", Minister President Winfried Kretschmann spoke to Thomas Speidel, founder and CEO of ADS-TEC Energy, about developments in ultra-fast charging, even on weak grids. "We have partnered with the Baden-Württemberg state at the Hannover Messe for over 10 years. Our vision for ADS-TEC Energy has now become a reality as a leading listed company," said Thomas Speidel. He explained that there are hurdles that ADS-TEC Energy, partners and infrastructure operators face: the new "German speed" invoked by politicians is still needed.  In addition, Speidel believes that sourcing products and services from local companies would help ensure the independence of the critical grid infrastructure.
Last week, Stadtwerke Oranienburg GmbH told the Federal Network Agency that the upstream high-voltage grid cannot provide sufficient power for Oranienburg. "This means that the supply options in the town of Oranienburg have been exhausted," said Peter Grabowsky, Managing Director of Stadtwerke Oranienburg. The additional capacity that has been requested for over a year has not been made available and, as a result, applications for charging infrastructure connections are no longer being approved.
"Grid expansion is reaching its limits and cannot grow fast enough to meet the demand for a functioning charging infrastructure," added Thomas Speidel. "We make fast charging possible even on the undeveloped and power-limited grid. The key to this is our integrated battery storage system. It allows us to support the grid for charging at up to 320 or 300 kW. When two EVs are charged at the same time it supports each at 160 or 150 kW."
With a footprint of just 1.95 m2, the ChargePost is particularly suited to urban areas where the grid is limited, and expansion would be costly and time-consuming. The ChargePost supports grid connections from 22 to 87 kW and can charge EVs in just a few minutes thanks to its innovative battery storage technology. But that's not all: the battery also feeds energy back into the grid.
"With this technology, we can not only store renewable energy directly on site, we also make energy trading possible. Electricity is either consumed directly on a decentralized basis or traded when there is no vehicle to charge," added Thomas Speidel. "ChargePost is a sustainable and profitable investment that can support different business models depending on the location. Not only can you charge EVs with this system, but you can also display advertising on the two 75-inch displays, use your own low-cost PV, and participate in electricity trading." In addition, customers can connect multiple ChargePosts to create a virtual power plant that reduces expensive grid peaks.
ADS-TEC Energy will be showcasing its sustainable solutions at the Baden-Württemberg Pavilion. Visit us in Hall 12 on Stand D15 and find out how our customers advance their energy transition with our solutions.

About ADS-TEC Energy
Based on more than ten years of experience with lithium-ion technologies, ADS-TEC Energy develops and produces battery storage solutions and fast charging systems including their energy management systems. Its battery-based fast-charging technology enables electric vehicles to charge ultra-fast even with weak power grids and is characterized by a very compact design. The company, based in Nürtingen, Baden-Württemberg, was nominated for the German Future Prize by the Federal President and was included in the "Circle of Excellence" in 2022. The high quality and functionality of the battery systems is due to a particularly high level of in-depth development and in-house production. With its advanced system platforms, ADS-TEC Energy is a valuable partner for car manufacturers, energy supply companies and charging station operators.
More information at: www.ads-tec-energy.com

Media Contacts

For ADS-TEC Energy – International
Juliane Kunz
Senior Press Officer
press@ads-tec-energy.com

For ADS-TEC Energy – US
Stephannie Depa
Breakaway Communications
+1 530-864-0136
sdepa@breakawaycom.com

 


Issuer: ADS-TEC Energy GmbH
Key word(s): Energy

Dissemination of a Press Release, transmitted by EQS News - a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


Language: English
Company: ADS-TEC Energy GmbH
Heinrich-Hertz-Str. 1
72622 Nürtingen
Germany
Internet: www.ads-tec.de
EQS News ID: 1886455

 
End of News EQS Media

fncls.ssp?fn=show_t_gif&application_id=1886455&application_name=news&site_id=boersengefluester~~~ace3d64b-2049-452a-8d18-fbc8044c4b5f

Visual performance / price development - ADS-TEC Energy GmbH
Smart analysis and research tools can be found here.

This publication was provided by our content partner EQS3.

EQS Newswire
via EQS - Newsfeed
EQS Group AG ©2024
(DGAP)
Contact:
Karlstraße 47 D-80333 München
+49 (0) 89 444 430-000

 

SMART * AD
EN GIF 970X250

P R O D U C T   S U G G E S T I O N S

The information presented here has been provided by our content partner EQS-Group. The originator of the news is the respective issuer, the company relating to the news, a publication service provider (press or information agency) which uses the distribution service of EQS to transmit company news to shareholders, investors, investors or interested parties. The original publications and other company-relevant information can be found at eqs-news.com.


The information you can access does not constitute investment advice. The presentation of our cooperation partners, where the implementation of investment decisions would be possible depending on the individual risk profile, is solely at the discretion of the person using the service. We only present companies of which we are convinced that the range of services and customer service will satisfy discerning investors.

If you are considering leverage products, familiarise yourself with the typical characteristics of the financial instruments beforehand. Take the time to determine the risk content of the planned investment before making an investment decision. Bear in mind that a total loss cannot be ruled out with leverage products.

For newcomers to the subject, we offer various options in both the training and the tools section, through which you can train theoretical knowledge and practical experience and thus improve your skills. The offer ranges from participation in webinars to personal mentoring. The range is continuously being expanded.


1 Lab features are usually functionalities that emerge from the think tank of the investor community. In the early stages, these are experimental functionalities whose development process is largely determined by use and the resulting feedback from the community. When integrating external services or functionalities, the functionality can only be guaranteed to the extent that the individual process elements, such as interfaces, interact with each other.