Put companies on watchlist
Friedrich Vorwerk Group SE
ISIN: DE000A255F11
WKN: A255F1
About
Company Snapshot
New: Enable Investor Alerts
Be informed about new publications
New: AI Factsheet

Corporate News meets AI! 
Content analysis and summary

EN GIF 300X250

Friedrich Vorwerk Group SE · ISIN: DE000A255F11 · EQS - Company News (46 News)
Country: Germany · Primary market: Germany · EQS NID: 1931027
24 June 2024 07:45AM

FRIEDRICH VORWERK wins major contract for the realisation of three additional sections of the South German natural gas pipeline (SEL) with a volume in the high double-digit million range


EQS-News: Friedrich Vorwerk Group SE / Key word(s): Incoming Orders
FRIEDRICH VORWERK wins major contract for the realisation of three additional sections of the South German natural gas pipeline (SEL) with a volume in the high double-digit million range

24.06.2024 / 07:45 CET/CEST
The issuer is solely responsible for the content of this announcement.


FRIEDRICH VORWERK wins major contract for the realisation of three additional sections of the South German natural gas pipeline (SEL) with a volume in the high double-digit million range

Tostedt, June 24, 2024 – Friedrich Vorwerk Group SE (ISIN DE000A255F11), a leading provider in the field of energy infrastructure, has been awarded a major contract by gas transmission system operator terranets bw as part of a joint venture for the realisation of three additional construction sections of the South German natural gas pipeline (SEL). Last year, the equal joint venture, consisting of the FRIEDRICH VORWERK Group (Friedrich Vorwerk and Bohlen & Doyen) and the Austrian HABAU Group (PPS Pipeline Systems and HABAU), already successfully won the first, approximately 24-kilometers-long section of the transport pipeline between Heilbronn and Löchgau in Baden-Württemberg. Following its planned completion at the end of 2024, works can now continue seamlessly on the three additional sections that have been acquired, totalling 43 kilometers in length, up to Esslingen am Neckar. The latest contract awarded to the joint venture has a project volume in the high double-digit million range and is scheduled for commissioning by the end of 2025.

With a total length of 250 kilometers from Lampertheim in Hesse to Bissingen in Bavaria, the "Süddeutsche Erdgasleitung" (SEL) planned by gas transmission system operator terranets bw is one of the largest pipeline construction projects in Germany. By connecting modern gas-fired power plants to the existing grid, it will secure the supply of heat and electricity and thus enable the phasing out of coal-fired power generation. As the first pipeline in the country with a connection to the European transport routes, it will transport hydrogen from 2030. The SEL will thus create important prerequisites for a CO2-neutral energy supply for the Rhine-Neckar region and the greater Stuttgart area. Construction of the pipeline will be realized in stages, depending on the specific development of demand over the next ten years. After the four construction lots with a total length of around 67 kilometers that have now been awarded, the remaining construction lots will be successively put out to tender in the coming years.

In view of the need to connect numerous new gas-fired power plants to the existing natural gas network as well as the planned realisation of the 9,700 kilometers long hydrogen core network, a large number of new construction and conversion measures are currently being planned by gas transmission system operators and will soon be implemented. Thanks to its broad service and technology portfolio and decades of experience in pipeline and pipework construction, FRIEDRICH VORWERK expects demand in this area to remain strong in the future.

Contact Details

Friedrich Vorwerk Group SE
Harburger Straße 19
21255 Tostedt
Tel +49 4182 – 2947 0
Fax +49 4182 - 6155
ir@friedrich-vorwerk.de
www.friedrich-vorwerk-group.de

Management Board
Torben Kleinfeldt (CEO)
Tim Hameister

Chairman of the Supervisory Board
Dr Christof Nesemeier

Court of Registration
District Court of Tostedt, registration number: HRB 208170



24.06.2024 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


Language: English
Company: Friedrich Vorwerk Group SE
Harburger Straße 19
21255 Tostedt
Germany
E-mail: ir@friedrich-vorwerk.de
Internet: www.friedrich-vorwerk-group.de
ISIN: DE000A255F11
WKN: A255F1
Listed: Regulated Market in Frankfurt (Prime Standard)
EQS News ID: 1931027

 
End of News EQS News Service

1931027  24.06.2024 CET/CEST

fncls.ssp?fn=show_t_gif&application_id=1931027&application_name=news&site_id=boersengefluester~~~ace3d64b-2049-452a-8d18-fbc8044c4b5f
Visual performance / price development - Friedrich Vorwerk Group SE
Smart analysis and research tools can be found here.

This publication was provided by our content partner EQS3.

EQS Newswire
via EQS - Newsfeed
EQS Group AG ©2025
(DGAP)
Contact:
Karlstraße 47 D-80333 München
+49 (0) 89 444 430-000

 

SMART * AD
EN GIF 970X250

P R O D U C T   S U G G E S T I O N S

The information presented here has been provided by our content partner EQS-Group. The originator of the news is the respective issuer, the company relating to the news, a publication service provider (press or information agency) which uses the distribution service of EQS to transmit company news to shareholders, investors, investors or interested parties. The original publications and other company-relevant information can be found at eqs-news.com.


The information you can access does not constitute investment advice. The presentation of our cooperation partners, where the implementation of investment decisions would be possible depending on the individual risk profile, is solely at the discretion of the person using the service. We only present companies of which we are convinced that the range of services and customer service will satisfy discerning investors.

If you are considering leverage products, familiarise yourself with the typical characteristics of the financial instruments beforehand. Take the time to determine the risk content of the planned investment before making an investment decision. Bear in mind that a total loss cannot be ruled out with leverage products.

For newcomers to the subject, we offer various options in both the training and the tools section, through which you can train theoretical knowledge and practical experience and thus improve your skills. The offer ranges from participation in webinars to personal mentoring. The range is continuously being expanded.


1 Lab features are usually functionalities that emerge from the think tank of the investor community. In the early stages, these are experimental functionalities whose development process is largely determined by use and the resulting feedback from the community. When integrating external services or functionalities, the functionality can only be guaranteed to the extent that the individual process elements, such as interfaces, interact with each other.